Long lead times
Long lead times turned into big savings
During the COVID supply-chain crunch, a higher-education managed-services provider needed large-scale access-layer hardware without waiting on standard channel availability. Edgeium helped source the required hardware from existing market inventory, then the relationship expanded as the economics became clear.
7,089Cisco units delivered, with $8.0M in hardware acquisition savings
Read the lead-time story →
Forced refresh + licensing
Forced refresh pressure became a support strategy
A Fortune 500 power company needed the network supported, but the OEM path tied supportability to refresh timing and new subscription-bearing replacements. Edgeium helped decouple support from the forced-refresh cycle with CovrEDGE third-party maintenance.
$28.7Mcumulative lifecycle value across 1,080 production switches
Read the forced-refresh case study →
End-of-Sale pressure
End-of-Sale did not have to mean replace everything
A multi-site operator faced an End-of-Sale event on a workhorse access switch. The channel path forced a newer replacement platform with recurring licensing. Edgeium helped the customer continue sourcing the original switch standard that still fit the job.
$1.66Msaved by avoiding unnecessary replacement economics across roughly 2,780 units
See the EoS analysis →
Budget constraints
A refresh stayed on schedule without the licensing burden
A healthcare network needed a large access refresh, but the channel path added a new mandatory subscription-based licensing model, and months of lead time. Edgeium sourced new sealed hardware, identical units in every way, and helped remove licensing costs the team did not intend to use.
$679,699saved on a 940-unit healthcare refresh fulfilled in about two weeks
Read the healthcare refresh story →
High maintenance renewal
Maintenance complexity became a right-sized support plan
A growing insurance company was managing dozens of contracts, unclear asset ownership, mismatched SLA tiers, and rising renewal costs. Edgeium documented the estate, removed unnecessary coverage, right-sized site SLAs, and consolidated maintenance under CovrEDGE.
57%blended maintenance cost reduction, with 38 termination dates consolidated to 2
Read the maintenance case study →